The Lodge:

Building Approval Services

Building projects often face delays during the approval phase, but getting your project approved doesn’t have to be your hassle

With a multidisciplinary team—including architects, certifiers, town planners, energy assessors, and structural engineers—VTAS bring extensive experience navigating complex approval pathways, cutting through red tape to save you time and money. 

The Building Approval Process

1.
Preliminary planning assessment

For an initial assessment fee our team offers a preliminary planning assessment to determine if your site and intended use meet the requirements for a Building Application (BA). To begin, provide us with your property location and a basic drawing indicating where you plan to place your Lodge.

2.
Engage our team

Once our assessment is complete, we'll provide a quote with estimated costs for obtaining building or development approval, and if you choose to proceed, your initial assessment fee will be deducted from the overall quote. To start the approval process, simply sign and return the quote along with the required fee.

3.
Start the Process

Once you're ready to proceed, we’ll coordinate with our structural engineers, energy assessors, and certifiers to begin the certification process. At the same time, we’ll send you a list of documents we’ll need from your side. You’ll also need to engage a geotechnical engineer, land surveyor, and any other required consultants specific to your site.

4.
Document Submission and Building Approval

Our team will manage the document submission process. Our certifier will review the assembled materials for compliance with BCA, Local building and planning rules. Upon approval, we will receive a Decision Notice and Approved Stamped Plans, authorizing the start of construction.

5.
Commence Construction

With the Building Permit in place, you can begin construction, adhering to the approved plans and any conditions specified in the permit. You will be required to notify us when inspections are needed (an inspection schedule will be on the approval documentation).

6.
Final Inspection and Occupancy

Once construction is complete, you’ll need to book a final inspection with us. Following a successful inspection, our certifier will issue the relevant documentation confirming that your building is ready for occupation, in accordance with your state or territory’s requirements.

VTAS Approvals: FAQ

Planning to get your VFAB kit home approved? This FAQ covers the most common questions about the approval process, from required documents to council fees and timelines. It’s designed to help you feel confident and clear at every step.

Septic, Sewerage, and Plumbing
  • Wastewater management report – prepared by a geotechnical consultant

  • Plumbing Forms 1 & 7 – completed by a licensed plumber

  • Dwelling plans – provided by VTAS

Yes. A licensed plumber is required for installation and can also manage the application process.

In this case, it refers to general support. Since you’re using a septic system, you’ll handle this with your local plumber and soil tester.

The septic application is not included in the quote. Since this part of the process is being handled independently by you and your plumber, it’s not covered under our planning support fee.

Site Conditions & Geotech

Yes, it’s mandatory for assessing footing design and approval.

Yes, we’ll gather quotes from 2–3 local geotechnical engineers.

Turnaround times can vary from several days to 2 weeks. 

Footings & Structures

Yes – footing design and certification are included as part of the Approval Package. This includes design for the Surefoot footing system only.
If a different footing system is required (e.g. due to soil conditions), additional fees will apply.

No – this is additional. We can request a quote for you

You’ll need to arrange a soil test for your site. Once complete, we’ll forward the results to Surefoot’s engineers, who will assess whether their system is suitable.

NT sites only: Please contact Surefoot before arranging the soil test, as they have their own in-house soil testing machine that may be used.

We recommend Surefoot because it is the most economically feasible solution for our kit homes and performs well across a wide range of soil conditions. It also integrates efficiently with our standard footing design, reducing the need for custom engineering.

Costs & Quoting

We include a Town Planning fee when the Certifier advises that an application to authorities is required.

Sometimes this can be avoided, and we’ll assess that during the desktop review.
In most cases, however, the application is mandatory — especially if the site has overlays like bushfire risk or landslip.

If it is required, we’ll help manage the process and documentation to make it as smooth and efficient as possible.

Yes. We charge $3,500 + GST for each additional unit.
If you decide to build a second unit after the first one has already been approved, the full approval fee will apply for the new unit.
To save on fees, it’s best to include all units in a single application where possible.

  • Consultant Fees
    If your site requires additional reports (e.g. Bushfire Attack Level, Flood, or Landslip Hazard), these will be outlined in your Desktop Assessment.
    We’ll help you get quotes from local specialists if needed.

  • Council Fees
    Council application and referral fees vary.
    Please check your local council’s website for the most accurate pricing.

  • Set-Out Survey
    This is completed during the footing stage to make sure all elements — especially footings — are positioned exactly according to your plans.

  • Levies & Insurances
    These may include Q-Leave levies, Home Warranty Insurance, or Owner-Builder permits, depending on your state and build method.

  • Septic Design
    If required, this will be prepared by the same company who does your soil test.
    Additional fees apply.

A BAL (Bushfire Attack Level) report is generally required, but there may be an opportunity to avoid it depending on site-specific assessment.

We recommend including the cost in your budget to be safe.
If it turns out the report isn’t needed, we’ll advise you during the approval process.

Yes. A site plan is included as part of our Approval Assistance package.

If you haven’t moved forward with approval assistance yet, we can still prepare a site plan for $500 + GST.
This amount will be deducted from the total Approval Assistance fee when you proceed with the full service.

No. For the approval process, we do not accept structural designs prepared by others.
To ensure compliance and coordination, all structural design must be done through our team.

Yes, you’re welcome to manage the approval process independently.

However, please note:
If you choose not to purchase the Approval Assistance Package now, VTAS will not be able to step in later.
We’re unable to take over partway through an approvals process already in progress.

Approval Process and Timeline

That’s completely up to you.

Keep in mind:
You can’t start any construction until the required approvals and documentation are in place.

Some clients prefer to begin the approval process before paying the deposit, to ensure everything is ready when the build is scheduled.

The timeframe can vary depending on:

  • Council processing time.

  • Consultant availability

  • How quickly you respond to Requests for Information (RFI)

We’ll help keep things moving, but allow several weeks to complete the process.